SEBEYA WATER RETENTION DAM

Sebeya

PROJECT DETAILS

Duration

18 months

Budget

Rwf 3,484 billion

Project manger

Eng Jean Claude Ndamukunda

NPD Limited commissioned the Quadra Plant with the capacity of 25,167 M2 per day, producing concrete poles,
concrete circular pipes, slabs, concrete culverts, and other concrete products. The plant also produces pavers
and cobblestones of various sizes and several other types of construction materials including, almost 99 percent
of the concrete electric poles which are used in the distribution of electricity in all parts of the country. They also
produce slabs used for covering ditches (concrete trench covers) and honeycombs for wall retention, depending
on the requirements of the clients.

Gallery

Scroll to Top