The DAIHO awarded NPD LTD a project located at Rusumo Border that was executed in 24 months. NPD LTD was a sub-contractor in this project with DAIHO (Japanese) being the Main Contactors.

The scope of work included but not limited to re constructing a Modern Border Post;

  • One Stop Boarder post at Rusumo going to Tanzania.
  • A 70M Bridge built with span and Asphalt roads were constructed.

project photos.jpg 12

The Rusumo Bridge still under construction

DSC05257

DSC05217

The completed Rusumo Bridge project