Some of the Dams NPD Ltd has been able to work on include; Rwinkwavu Dam, Kayonza IV Dam and Ngoma Dams in the Eastern province. The sole purpose of the Dam construction is to improve of the irrigation system. The scope of work done in the construction of these dams includes but is not limited to;
⦁ Constructing a dam to create one water storage point to be used in irrigation during the dry season. Water storage is done during the rainy season
⦁ Supplying and installing a pump that pushes the water into a regulating tank
⦁ Constructing channels from the regulating tank leading to the different land fields in the areas in which the Dam exists.